The Shingle Roof Installation Process: 13 Steps Done Right in Texas
A shingle roof installation strips the old roof to the deck, then layers protection back on in a fixed sequence: deck prep, drip edge, valley membrane, underlayment, starter strip, field shingles, flashing, and ridge cap. Each layer protects the one beneath it, and a shingle roof that fails early almost always traces to one step skipped or done out of order.
Family owned, locally accountable
COO & President — the father and son behind ARP
The proof behind the promise
GAF Certified Plus Contractor · Atlas PRO+ Platinum Select · 5,000+ Texas roofs
Why the order
Why the order of a shingle install decides how long it lasts
Here's the thing most homeowners never get told about shingle roofing in Texas: a shingle roof is only as good as the sequence it was built in. You can buy the best Class 4 shingle on the market, and if the crew lays the drip edge over the underlayment at the eave instead of under it, or skips the valley membrane, water finds the deck anyway. The shingles you can see are the smallest part of the job. The parts that actually protect you are the layers underneath, installed in a specific order, and you only get to inspect them for a few hours before the next layer hides them for 20 years.
That's why this page walks the install the way a real Texas replacement runs, top to bottom, with the reason each step matters and what it costs you when a contractor cuts it. Use it to judge any bid you get, including ours. If a contractor can't tell you what goes down before the shingles, you already have your answer.
The ARP Shingle
The ARP Shingle Install Sequence, Step by Step
Every asphalt shingle roof ARP installs follows the same 13-step order. The steps don't move, because the physics of water and wind don't move.
- Tear off down to the bare deck. The old shingles, underlayment, and flashing come off completely so the crew can see the wood. Roofing over an old layer hides rot and costs you a second tear-off in a few years.
- Inspect and re-nail the decking. With the deck exposed, your project manager checks for soft, rotted, or delaminated plywood and re-nails loose sheathing to code. If we find bad decking, you get a change order with a photo before anyone replaces a board. Nobody swaps wood on your roof without your sign-off, and nobody buries rot under new shingles either.
- Install drip edge at the eave. A metal drip edge goes on the lower roof edges first, kicking runoff into the gutter instead of behind it. Skip it and water wicks back onto the fascia, which is how you get rotted eaves and peeling paint two winters later.
- Lay ice-and-water membrane in the valleys and around penetrations. A self-adhering waterproof membrane seals the roof's highest-risk spots: the valleys where two slopes dump water together, and every pipe, vent, and chimney base. These are where roofs leak first. The membrane is your backup seal if a shingle ever lifts.
- Roll out synthetic underlayment across the field. Synthetic underlayment covers the rest of the deck as a secondary water barrier under the shingles. It sheds the wind-driven rain that gets past shingles in a Texas storm, and it holds up in heat far better than old felt paper.
- Install drip edge at the rake, over the underlayment. On the sloped side edges, the drip edge goes on top of the underlayment (the reverse of the eave). That order locks the wind out of the roof edge, which is exactly where Texas gusts try to peel a roof.
- Set the starter strip along the eaves and rakes. A purpose-made starter course with a factory adhesive strip runs the perimeter first. It bonds the first row of shingles down and seals the edges. Contractors who "start with a cut shingle" to save money leave your edges prone to blow-off.
- Lay the field shingles with the right nailing and offset. The shingles go up in courses, each nailed with 4 to 6 nails placed in the manufacturer's nail zone, with joints offset row to row. Nail high, nail short, or nail too few, and the manufacturer's wind warranty is void the day it's installed. This is the single most common shortcut in the trade.
- Flash the walls, chimney, and valleys. New step flashing and counter-flashing tie the roof into every wall and chimney; valley metal or a woven valley finishes the channels. Reusing old, painted-over flashing is a leak waiting to happen. Fresh, correctly lapped flashing is what keeps water out at the transitions.
- Install the ridge vent. A continuous ridge vent is cut in at the peak to let hot attic air escape. Proper ventilation is what keeps your attic from cooking the shingles from below and shortening their life in Texas heat.
- Cap the ridge. Matching hip-and-ridge cap shingles finish the peaks over the vent, sealed and nailed for the exposed high point of the roof. Field shingles bent over the ridge (another cost-cut) crack and blow off first.
- Clean up and run the magnet sweep. The crew hauls debris, and a rolling magnet passes over the yard, beds, and driveway to pull stray nails. This is your family's and your tires' protection, and it's part of our Clean Site Promise, not an afterthought.
- Final inspection and photo documentation. An ARP project manager walks the finished roof, checks the details, and photographs the work, including the layers now hidden under the shingles. You get documentation of what you paid for.
A shingle roof is built in a sequence, and the sequence is where it's won or lost. Starter, valley membrane, underlayment, drip edge in the right order, then the field. Skip a step and the roof still looks finished from the driveway. It just doesn't last. We install to the sequence every time and photograph it, because the parts that protect you are the ones you can't see once the last shingle is down.
Randal Williams · COO, ARP Roofing & Remodeling
The crew on your roof is led by an ARP project manager who inspects the work at the deck, mid-install, and final stages. That oversight is where the sequence gets enforced, because a step is easy to skip when nobody is checking.
How long does
How long does a shingle roof take to install?
Most shingle roofs on an average Texas home go on in 1 to 2 days. A standard 2,000 to 2,500 sq ft roof with straightforward access is usually a single day for tear-off and install, with a second day for larger, steeper, or multi-layer roofs, or when the deck needs repairs. Weather moves the schedule too, since your crew won't dry-in a roof into an incoming storm.
Speed is not the same as rushed. A one-day roof done in the right order beats a job stretched over a week with the valley membrane skipped. What you want to watch is not how fast the shingles go up, but whether the layers underneath went down first.
How to judge
How to judge any contractor's install, including ours
You don't need to learn the trade to hold a contractor to the sequence. You need three questions, and you should get clear answers to all three before you sign anything.
- "What goes down before the shingles?" A real answer names drip edge, valley and penetration membrane, synthetic underlayment, and starter strip. Vague answers mean vague work.
- "What happens if you find rotted decking after tear-off?" You want to hear "a change order with a photo before we replace anything," not a number invented on the spot or wood quietly swapped and billed later.
- "Will I get photos of the finished roof and the layers underneath?" The parts that protect you disappear under the shingles. Documentation is the only way you ever confirm they were installed.
A contractor who answers these plainly is telling you they build to a standard. One who gets cagey is telling you something too.
Honest Fit Check
Is ARP the right fit for your shingle install?
Yes, if:
- You want the layers under your shingles installed in the correct order and documented with photos
- You want a project manager checking the work at the deck, mid-install, and final stages
- You want an honest change order (with a photo) before anyone replaces decking
- You're planning to stay in your home and want a roof that lasts its full Texas life
No, if:
- You're shopping on lowest price alone, since a corner-cut install will always bid cheaper than a correct one
- You need a small patch on a few shingles, since a targeted shingle repair or replacement may be all you need
- You want someone to roof over your existing layer to save a day, since we tear off to the deck every time
Your simple plan
Your simple plan to get it done right
Getting a correctly sequenced roof is not complicated on your end.
- Book a free inspection. An ARP project manager assesses your roof and deck and walks you through what your install actually needs.
- Review your estimate and scope. You see the materials, the sequence, and the price in writing before any work starts.
- We install to the sequence and document it. Your roof goes on in the right order, and you get the photos to prove it.
Get a free ARP roof inspection →
Not ready yet? See what makes up your roof before you call.
Where to Go Next
Where to Go Next
Shingle Roofing Guide
Every shingle grade side by side, and how to choose for your Texas home
See Shingle Roofing Guide →3-Tab vs Architectural
The budget tier and the standard tier, weighed factor by factor
See 3-Tab vs Architectural →Shingle Roof Lifespan
How long a shingle roof really lasts in Texas heat, and what shortens it
See Shingle Roof Lifespan →Shingle Roof Cost
Real installed price ranges by grade and home size, with what's included
See Shingle Roof Cost →GAF Certified Plus Contractor · Atlas PRO+ Platinum Select · Registered with all municipalities across our service areas
Questions that decide the job
Frequently Asked Questions
What goes down before shingles on the roof?
+
How long does it usually take to shingle a roof?
+
How do you start the first row of shingles?
+
What is required before installing asphalt shingles?
+
Should the decking be replaced during a shingle install?
+
How many nails does each shingle need?
+
Start with the assessment, not the estimate
We look at the roof, document what we find with photographs, and give you the written assessment — whether or not you hire us. Then you decide, on your timeline.